Admin message

Warning: Mattermost will be removed from GitLab 19, due on May 21, 2026. If you are currently using this service, we suggest you install a dedicated server and migrate your data.

Add helium recharge procedure

An automatic procedure to recharge the engine helium tank should be developed and implemented.
The requirements:

  • the pressure of the refill tank has to be set with its regulator to 30 bar
  • the heat gun has to be set to medium power
  • the water pump has to be on
  • the recharge valve has to be activated
  • the output valve has to be activated
  • the engine has to be turned off when the receiver temperature goes below 10°C
  • the engine has to be turned on after a standby period of 60 seconds or when the receiver temperature goes above 100°C
  • the entire procedure has to stop when the engine's tank reaches a pressure of about 180 bar

@bartali @cavada

Edited Jul 02, 2019 by Alberto Bonizzi
Assignee Loading
Time tracking Loading